With the daily goal oriented innovation and the development Grameyer presents the CGH and PCH in Integrated Container, special design for construction and rehabilitation. All electrical equipment is installed in a container (or containers) specially adapted for this purpose. This proposal allows you to do all the installation and testing of equipment in a factory environment, thus having a greater quality control and full operation of all components. The civil work of PCH decreases significantly, eliminating all the setbacks inherent in masonry projects. Requires only a concrete base to support the container, which is structurally self-supporting, with proven stiffness. The container can be placed on the floor or on a support allowing a height required for insulation.